2MM HEAT MASTER
10M2 PERFORATED
UNDERLAY
QUANTITY PER ROLL | 10m2 |
---|---|
ROLL SIZE | 2mm x 1m x 10m |
TOG RATING | 0.35 |
SOUND IMPROVEMENT | 20dB |
UNDERFLOOR HEATING Y/N | Yes |
COMPRESSIVE STRENGTH | Very Good |
HEAT TRANSFER RESISTANCE | 0.035 k/w m² |
THERMAL INSULATION | Very Good |
DENSITY | 33kg / m² |
PRODUCT CODE | F1010014 |
• SIGNIFICANTLY REDUCES NOISE FROM WOODEN AND LAMINATE FLOORING
• HELPS TO LEVEL OUT ANY MINOR UNEVENNESS IN THE SUBFLOOR
• PREVENTS OVER STRAINING OF THE FLOOR BOARDS
Laying Instructions
Before starting to lay the material, take care that the sub floor is even, dry, clean and pressure resistant. 2mm Heat
Master should be rolled onto the floor parallel to the wall at right angles to the direction in which you plan to lay the
floor covering. It can be trimmed with a cutter or sharp knife. Once the underlay is laid out all joints must be taped.
If laying over cement screed, the joints should be sealed with a waterproof tape such as duck tape. We also
recommend using a moisture barrier (e.g. 1000 gauge polythene) beneath the underlay for additional moisture
protection. Extend the moisture barrier up the walls behind the skirting, overlap any joints by 300mm (12”) and
tape with a waterproof tape. When the whole room has been laid, the intended floor covering (laminate, cork,
prefabricated parquet etc.) can be laid on top.